✓ Official Status report: 100% complete
Ministry of Works status report for September 2026. Physical progress stands at 100%.
The Anambra State Government has initiated the construction of a 0.4 km access road into the Awka Waste Dump Site. This project aims to improve accessibility for waste management and facilitate better operational efficiency at the site.
The Anambra State Government has initiated the construction of a 0.4 km access road into the Awka Waste Dump Site. This project aims to improve accessibility for waste management and facilitate better operational efficiency at the site. The site handover for this construction was completed on April 17, 2024, with the goal of addressing the logistical challenges associated with the waste dump site in Awka
Ministry of Works status report for September 2026. Physical progress stands at 100%.